본문으로 바로가기 메뉴 바로가기

HYORIM Industries Inc.

Experiences 사업실적

취수설비

Intake Facility

PROJECT(LOCATION) CLIENT WORK SCOPE COMPLETION
FUJAIRAH F3 INDEPENDENT POWER PLANT(UAE) SAMSUNG C&T / FUJAIRAH POWER COMPANY F3 INTAKE FACILITIES ( Capacity : 43,076 m³/h ) 2021
( on going )
WASTE HEAT RECOVERY PROJECT(UAE) SAMSUNG ENGINEERING LTD., CO. / ABU DHABI OIL REFINING COMPANY INTAKE FACILITIES ( Capacity : 40,000 m³/h ) 2020
HPC PROJECT HYUNDAI ENGINEERING CO. LTD / HYUNDAI CHEMICAL CO., LTD INTAKE FACILITIES ( Capacity : 12,500 m³/h ) 2020
POHANG NO. 19 CCPP POSCO E&C / POSCO INTAKE FACILITIES ( Capacity : 22,000 m³/h ) 2020
RIAU GFPP 275MW IPP PROJECT LOTTEN E&C / PT. MEDCO RATCH POWER RIAU INTAKE FACILITIES ( Capacity : 420 m³/h ) 2020
SUPPLY AND ERECTION WITH O&M SERVICES OF DOHA SWRO DESALINATION PLANT WITH RECARBONATION[ STAGE - 2 ) DOOSAN HEAVY INDUSTRIES / MINISTRY OF ELECTRICITY & WATER STATE OF KUWAIT INTAKE FACILITIES ( Capacity : 14,000 m³/h ) 2019
TAMBAK LOROK COMBINED CYCLE POWER PLANT BLOCK 3 PROJECT BLACK & VEATCH / INDONESIA POWER INTAKE FACILITIES ( Capacity : 26,500 m³/h ) 2019
CIREBON 2 , 1x1000MW COAL FIRED POWER PLANT HYUNDAI ENGINEERING & CONSTRUCTION / CIREBON POWER INTAKE FACILITIES ( Capacity : 3,200 m³/h ) 2019
NGHI SON 2 BOT THERMAL POWER PLANT(VIETNAM) DOOSAN HEAVY INDUSTRIES / NGHI SON 2 POWER LIMITED LIABILITY COMPANY INTAKE FACILITIES (Capacity : CWP 43,000 m³/h , QWP 22,500 m³/h ) 2019
SHOAIBA RO PHASE 4 DESALINATION PLANT DOOSAN HEAVY INDUSTRIES / SALINE WATER CONVERSION CORPORATION INTAKE FACILITIES ( Capacity : 11,500 m³/h 2019
KUWAIT AL ZOUR LNG IMPORT PROJECT HYUNDAI ENGINEERING CO. LTD / KUWAIT NATIONAL PETROLEUM COMPANY INTAKE FACILITIES ( Capacity : 38,915 m³/h ) 2019
SUPPLY AND ERECTION WITH O&M SERVICES OF DOHA SWRO DESALINATION PLANT WITH RECARBONATION[ STAGE - 1 ) DOOSAN HEAVY INDUSTRIES / MINISTRY OF ELECTRICITY & WATER STATE OF KUWAIT INTAKE FACILITIES ( Capacity : 14,000 m³/h ) 2018
TAKHIATASH POWER PLANT EFFICIENCY IMPROVEMENT HYUNDAI ENGINEERING CO. LTD / JSC TAKHIATASH TPP OF JSC UZBEKENERGO INTAKE FACILITIES (Capacity : 1,300 m³/h 2018
LONTAR EXTENSION COAL FIRED STEAM POWER PLANT BLACK & VEATCH / PT. PERUSAHAAN LISTRIK NEGARA (PERSERO) INTAKE FACILITIES ( Capacity : 29,400 m³/h ) 2018
PANAMA COLON POWER PLANT POSCO E&C / GAS NATURAL ATLANTICO S .DE R.L INTAKE FACILITIES ( Capacity : 13,500 / 1,800 m³/h ) 2017
JEJU COMBINED CYCLE POWER PLANT DOOSAN HEAVY INDUSTRIES /KOREA MIDLAND POWER CORPORATION INTAKE FACILITIES ( Capacity : 5,650 m³/h ) 2017
CENTRALE ELECTRIQUE EN CYCLE COMINED MOSTAGHANEM 1450.356 MW SAMSUNG C&T / Societe Algerienne de Production de I Electricite INTAKE FACILITIES ( Capacity : 38,000 m³/h 2017
VINH TAN 4 EXTENSION THERMAL POWER PLANT PROJECT (VIETNAM) DOOSAN HEAVY INDUSTRIES / VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD INTAKE FACILITIES ( Capacity : 41,820 m³/h ) 2017
GRATI CCPP (PEAKER) EXTENSION PROJECT 450MW LOTTEN E&C / PT. PERUSAHAAN LISTRIK NEGARA (PERSERO) INTAKE FACILITIES ( Capacity : 22,500 m³/h 2017
MASINLOC POWER PLANT EXPANSION POSCO E&C / MASINLOC POWER PARTERS CO.,LTD INTAKE FACILITIES ( Capacity : 31,500 m³/h ) 2017
UTE PUNTA DEL TRIGRE CCPP HYUNDAI ENGINEERING & CONSTRUCTION / TU EMPRESA INTAKE FACILITIES ( Capacity : 21,000 m³/h) 2016
BARAKAH # 1~4 NUCLEAR POWER PLANT (UAE) KOREA ELECTRIC POWER CORPORATION / EMIRATES NUCLEAR ENERGY CORPORATION INTAKE FACILITIES ( Capacity : 5,905 / 30,662 m³/h / 40,883 m³/h ) 2016
UMM AL HOUR POWER IWPP (QATAR) SAMSUNG C&T / UMM AL HOUL POWER INTAKE FACILITIES ( Capacity : 52,280 m³/h ) 2016
RGT-2 TERMINAL PROJECT SAMSUNG C&T / PETRONAS INTAKE FACILITIES ( Capacity : 6,011 m³/h 2016
VINH TAN 4 THERMAL POWER PLANT PROJECT (VIETNAM) DOOSAN HEAVY INDUSTRIES / VINH TAN THERMAL POWER PROJECT MANAGEMENT BOARD INTAKE FACILITIES ( Capacity : 41,820 m³/h ) 2016
TURKMENISTAN ETHANE CRACKER & PE PP PLANT HYUNDAI ENGINEERING CO. LTD / STATE CONCERN " TURKMENGAS " INTAKE FACILITIES ( Capacity : 2,410 m³/h ) 2016
TRIPOLI 4 x 350MW POWER PLANT HYUNDAI ENGINEERING & CONSTRUCTION / GENERAL ELECTRIC COMPANY INTAKE FACILITIES ( Capacity : 34,283 m³/h) 2015
CHILE KELAR PROJECT SAMSUNG ENGINEERING LTD., CO. / BHPBILLITON KELAR S.A INTAKE FACILITIES ( Capacity : 1,400 m³/h ) 2015
ESCONDIDA WATER SUPPLY PROJECT DOOSAN HEAVY INDUSTRIES / MINERA ESCONDIDA INTAKE FACILITIES ( Capacity : 15,332 m³/h ) 2015
RABIGH 2 INDEPENDENT POWER PROJECT SAMSUNG C&T / ALMOURJAN ELECTRICITY ELECTRICITY PRODUCTION COMPANY INTAKE FACILITIES ( Capacity : 32,600 m³/h ) 2015
YANBU POWER & DESALINATION PLANT PH 3 (SAUDI ARABIA) DOOSAN HEAVY INDUSTRIES / SALINE WATER CONVERSION CORPORATION INTAKE FACILITIES ( Capacity : 123,800 m³/h ) 2015
BUK-PYEONG TERMAL POWER PLANT 1&2 STX HEAVY INDUSTIES CO. LTD / STX ELECTRIC POWER CO.LTD INTAKE FACILITIES ( Capacity : 22,000 m³/h ) 2015
SHIN BO RYEONG THERMAL POWER PLANT #1,2 (KOREA) GS E&C / KOREA MIDLAND POWER CORPORATION INTAKE FACILITIES ( Capacity : 40,250 m³/h ) 2015
FAST TRACK 3A 1X1000MW COAL FIRED POWER PLANT (MALAYSIA) DAELIM INDUSTRIAL CO., LTD. / TNB WESTERN ENERGY BERHAD INTAKE FACILITIES ( Capacity : 63,000 m³/h ) 2015
TALIMARJAN THERMAL POWER PLANT EXPANSION PROJECT HYUNDAI ENGINEERING & CONSTRUCTION / TALIMARJAN TPP UNITARY ENTERPRISE OF SJSC UZBEKENERGO INTAKE FACILITIES (Capacity : 6,200 m³/h / 24,400 m³/h 2015
RAS-DJINEET 1131.1MW COMINED CYCLE POWER PLANT DAEWOO E&C / Societe Algerienne de Production de I Electricite INTAKE FACILITIES ( Capacity : 34,983 m³/h ) 2014
TAKORADI T1 ONCE-THROUGH SWA WATER COOLING SYSTEM KEPCO E&C / VOITA RIVER AUTHORITY INTAKE FACILITIES ( Capacity : 19,008 m³/h ) 2014
AZ ZOUR INDEPENDENT WATER AND POWER PLANT HYUNDAI HEAVY INDUSTRIES / PARTERSHIPS TECHNICAL BUREAU OF STATE INTAKE FACILITIES ( Capacity : 60,300 m³/h ) 2014
YEO SU THERMAL POWER PLANT # 1 KOREA SOUTH-EAST POWER CORPORATION INTAKE FACILITIES ( Capacity : 30,000 m³/h ) 2014
SHIN ULCHIN NUCLEAR POWER PLANT # 1,2 KOREA HYDRO & NUCLEAR POWER CORPORATION INTAKE FACILITIES ( Capacity : 3,861 / 38,883 m³/h ) 2014
TONGYOUNG LNG TERMINAL 8th EXTENTION PLANT SAMSUNG C&T / KOREA GAS CORPORATION INTAKE FACILITIES ( Capacity : 10,000 m³/h ) 2014
PRAI CCGT POWER PLANT (MALAYSIA) SAMSUNG C&T (KL) SDN.BHD / TNB NORTHERN ENERGY SDN.BHD INTAKE FACILITIES ( Capacity : 46,050 m³/h ) 2014
ASHUGANJ 225MW COMBINED CYCLE POWER PLANT HYUNDAI ENGINEERING CO. LTD / ASHUGANJ POWER STATION COMPANY LIMITED INTAKE FACILITIES ( Capacity : 23,200 m³/h ) 2014
ZWITINA POWER PLANT DAEWOO E&C / GENERAL ELECTRIC COMPANY INTAKE FACILITIES ( Capacity : 30,000 m³/h ) 2013
GHANA TAKORADI T2 EXPANSION PROJECT KEPCO E&C / TAKORADI INTERNATIONAL COMPANY INTAKE FACILITIES ( Capacity : 19,008 m³/h ) 2013
SAMCHEOK LNG TERMINAL PHASE 1 KOREA GAS CORPORATION INTAKE FACILITIES ( Capacity : 12,000 m³/h ) 2013
POHANG BY PRODUCT GAS CCPP UNIT NO 1&2 POSCO ENGINEERING CO / POSCO ENERGY INTAKE FACILITIES ( Capacity : 10,500 m³/h ) 2013
YULCHON II COMBINED CYCLE POWER PROJECT HYUNDAI ENGINEERING & CONSTRUCTION / MPC YULCHON GENERATION CO., LTD INTAKE FACILITIES ( Capacity : 34,000 m³/h ) 2013
HYUNDAI GREEN POWER STEEL BY PRODUCT GAS THEMAL POWER PLANT ( 5 ~ 8 ) HYUNDAI ENGINEERING & CONSTRUCTION / HYUNDAI GREEN POWER CO.,LTD INTAKE FACILITIES ( Capacity : 19,150 m³/h ) 2013
YONGHUNE THERMAL POWER PLANT # 5,6 KOREA SOUTH-EAST POWER CORPORATION INTAKE FACILITIES ( Capacity : 36,500 m³/h ) 2013
JORF LASFAR UNIT 5&6 (MOROCCO) DAEWOO E&C/ JORF LASFAR ENERGY COMPANY 5&6 SA INTAKE FACILITIES (Capacity : 65,000 m³/h(CWP),20,500 m³/h(SWP)) 2012
POSCO POWER INDONESIA ISM POWER POSCO ENGINEERING CO / PT KRAKATAU POSCO POWER INTAKE FACILITIES ( Capacity : 19,000 m³/h ) 2012
MONG DUONG 2 COAL FIRED POWER (VIETNAM) DOOSAN HEAVY INDUSTRIES / AES-VCM MONG DUONG POWER COMPANY LIMITED INTAKE FACILITIES ( Capacity : 41,820 m³/h ) 2012
QURAYYAH INDEPENDENT POWER 1&2 (SAUDI ARABIA) SAMSUNG C&T / HAJR ELECTRICITY PRODUCTION COMPANY INTAKE FACILITIES ( Capacity : 59,200 m³/h ) 2012
SUR INDEPENDENT POWER PROJECT (OMAN) DAEWOO E&C / PHOENIX POWER COMPANY SAOC INTAKE FACILITIES ( Capacity : 42,667 m³/h ) 2012
SHUWEIHAT S3 POWER GENERATION PLANT (UAE) DAEWOO E&C / Abu Dhabi Water & Electricity Authority INTAKE FACILITIES ( Capacity : 40,000 m³/h ) 2012
SOUTH PARS GAS FIELD DEVELOPMENT PH 19 SHERKAT SANAYEA FARASAHEL / The National Iranian Oil Company (NIOC) / Pars Oil&Gas Company INTAKE FACILITIES ( Capacity : 10,000 m³/h ) 2012
BOROUGE-3 UTILITIES & OFFSITES PROJECT (UAE) HYUNDAI ENGINEERING & CONSTRUCTION / ABU DHABI POLYMERS COMPANY LINITED INTAKE FACILITIES ( Capacity : 45,500 m³/h ) 2012
SOUTH PARS GAS FIELD DEVELOPMENT PH12 DAELIM INDUSTRIAL CO., LTD. / The National Iranian Oil Company (NIOC) / Pars Oil&Gas Company INTAKE FACILITIES ( Capacity : 20,000 m³/h ) 2011
RUWAIS REFINERY EXPANSION PACKAGE #3 O&U SAMSUNG ENGINEERING LTD., CO. / ABU DHABI OIL REFINING COMPANY INTAKE FACILITIES ( Capacity : 19,000 m³/h ) 2011
BARKA 3 INDEPENDENT POWER PLANT GS ENGINEERING & CONSTRUCTION / AL SUWADI POWER COMPANY SAOC INTAKE FACILITIES ( Capacity : 24,000 m³/h ) 2011
AL-KHALIJ 4 x 350MW POWER PLANT HYUNDAI ENGINEERING & CONSTRUCTION / GENERAL ELECTRIC COMPANY INTAKE FACILITIES ( Capacity : 34,283 m³/h) 2010
MISURATA COMBINED CYCLE POWER PLANT DAEWOO E&C / GENERAL ELECTRIC COMPANY INTAKE FACILITIES ( Capacity : 30,000 m³/h ) 2009
ANGAMOS THERMOELECTRIC POWER PLANT POSCO E&C / AES GENER S.A INTAKE FACILITIES ( Capacity : 4,900 m³/h ) 2009
AL DUR INDEPENDENT WATER AND POWER PLANT HYUNDAI HEAVY INDUSTRIES / MINISTRY OF FINANCE INTAKE FACILITIES ( Capacity : 37,090 m³/h ) 2009
GWANGYANG BY PRODUCT GAS CCPP UNIT NO 1&2 POSCO ENGINEERING CO / POSCO POWER INTAKE FACILITIES ( Capacity : 9,000 m³/h ) 2009
SHIN WOLSONG NUCLEAR POWER # 1,2 PLANT KOREA HYDRO & NUCLEAR POWER CORPORATION INTAKE FACILITIES ( Capacity : 2,953/41,186 m³/h ) 2009
HYUNDAI GREEN POWER STEEL BY PRODUCT GAS THEMAL POWER PLANT ( 1~4 ) DAELIM INDUSTRIAL CO., LTD / HYUNDAI GREEN POWER CO.,LTD INTAKE FACILITIES ( Capacity : 19,150 m³/h ) 2009
GHECO ONE 660MW COAL FIRED POWER PLANT DOOSAN HEAVY INDUSTRIES / GHECO ONE COMPANY LIMITED INTAKE FACILITIES ( Capacity : 36,500 m³/h ) 2009
CIREBON COAL FIRED POWER PLANT DOOSAN HEAVY INDUSTRIES / PT CIREBON ELECTRIC POWER INTAKE FACILITIES ( Capacity : 6,225 m³/h ) 2009
CEBU COAL FIRED POWER PLANT DOOSAN HEAVY INDUSTRIES / KEPCO SPC POWER CORPORATION INTAKE FACILITIES ( Capacity : 11,280 m³/h ) 2009
QATALUM COMBINED CYCLE POWER PLANT DOOSAN HEAVY INDUSTRIES / QATALUM INTAKE FACILITIES ( Capacity: 3,100 / 5,200 / 8,475 / 23,300 m³/h ) 2008
BARKA Ⅱ POWER AND DESALINATION PROJECT DOOSAN HEAVY INDUSTRIES / SMN BARKA POWER COMPANY SAOC INTAKE FACILITIES ( Capacity: 21,500 / 15,590m³/h ) 2008
MARAFIQ INDEPENDENT WATER AND POWER PLANT (SAUDI ARABIA) HYUNDAI HEAVY INDUSTRIES / JUBAIL WATER AND POWER COMPANY INTAKE FACILITIES ( Capacity : 40,944 m³/h ) 2008
SHIN KORI NUCLEAR POWER PLANT # 1,2 (KOREA) KOREA HYDRO & NUCLEAR POWER CORPORATION INTAKE FACILITIES ( Capacity : 2,953 / 44,289 m³/h ) 2008
Q-CHEM Ⅱ ETHYLENE DERIVATIVES DAEWOO E&C / Q-CHEM Ⅱ PETRROCHEMICAL COMPLEX INTAKE FACILITIES ( Capacity: 14,000 m³/h ) 2007
TONGYOUNG LNG TERMINAL 4th EXTENTION PLANT KOREA GAS CORPORATION INTAKE FACILITIES ( Capacity : 10,000 m³/h ) 2007
BORYUNG THERMAL POWER PLANT # 7,8 KOREA MIDLAND POWER CORPORATION INTAKE FACILITIES ( Capacity : 22,800 m³/h ) 2007
YONGHUNE THERMAL POWER PLANT # 3,4 KOREA SOUTH-EAST POWER CORPORATION INTAKE FACILITIES ( Capacity : 36,500 m³/h ) 2006
NO NAME OF OWNER / CLIENT PROJECT TITLE / COUNTRY Completion
1 KOREA ELECTRIC POWER CORPORATION /

DOOSAN HEAVY INDUSTRIES
HADONG # 5,6 THERMAL POWER PLANT 1998
2 KOREA ELECTRIC POWER CORPORATION BORYUNG # 1, 2 COMBINED CYCLE POWER PLANT 1998
3 KOREA SOUTH-EAST POWER CORPORATION YONGHUNG # 3,4 THERMAL POWER PLANT 2006
4 KOREA MIDLAND POWER CORPORATION BORYUNG # 7, 8 THERMAL POWER PLANT 2007
5 KOREA GAS CORPORATION TONGYOUNG LNG TERMINAL 4th EXTENTION PLANT 2007
6 KOREA HYODRO & NUCLEAR POWER CORPORATION SHIN KORI # 1,2 NUCLEAR POWER PLANT 2008
7 KOREA GAS CORPORATION TONGYOUNG LNG TERMINAL 5th EXTENTION PLANT 2009
8 HYUNDAI GREEN POWER CO.,LTD

/ DAELIM INDUSTRIAL CO., LTD
HYUNDAI GREEN POWER STEEL BY PRODUCT GAS THEMAL POWER PLANT
( 1~4 )
2009
9 KOREA HYODRO & NUCLEAR POWER CORPORATION SHIN WOLSONG # 1,2 NUCLEAR POWER PLANT 2009
10 POSCO POWER /

DAEWOO ENGINEERING COMPANY
GWANGYANG BY PRODUCT GAS CCPP UNIT NO 1 & 2

(KOREA)
2009
11 HYUNDAI GREEN POWER CO.,LTD /

HYUNDAI ENGINEERING & CONSTRUCTION
HYUNDAI GREEN POWER STEEL BY PRODUCT GAS THEMAL POWER PLANT
 ( 5 ~ 8 )
2012
12 HYUNDAI ENGINEERING & CONSTRUCTION /

MPC YULCHON GENERATION CO., LTD
YULCHON II COMBINED CYCLE POWER PROJECT 2013
13 POSCO ENGINEERING CO /

POSCO ENERGY
POHANG BY PRODUCT GAS CCPP UNIT NO 1&2 2013
14 KOREA GAS CORPORATION SAMCHEOK LNG TERMINAL PHASE 1 2013
15 KOREA SOUTH-EAST POWER CORPORATION YONGHUNG # 5,6 THERMAL POWER PLANT 2013
16 SAMSUNG C&T /

KOREA GAS CORPORATION
TONGYOUNG LNG TERMINAL 8th EXTENTION PLANT 2014
17 KOREA HYODRO & NUCLEAR POWER CORPORATION SHIN ULCHIN # 1,2 NUCLEAR POWER PLANT 2014
(on-going)
18 STX HEAVY INDUSTIES CO. LTD /

STX ELECTRIC POWER CO.LTD
BUK-PYEONG TERMAL POWER PLANT 1&2 2014
(on-going)
19 KOREA SOUTH-EAST POWER CORPORATION YEO SU THERMAL POWER PLANT # 1 2014
(on-going)
20 GS E&C /

KOREA MIDLAND POWER CORPORATION
SHIN BO RYEONG THERMAL POWER PLANT #1,2 2014
(on-going)
닫기
KOR / ENG