PROJECT(LOCATION) | CLIENT | WORK SCOPE | COMPLETION |
---|
KORAE SEAWATER DESALINATION (UAE) |
KORAE / DAEWOO E&C [ MASDAR ] |
DAF + UF + SWRO + BWRO | (On-going) |
FUJAIRAH F3 INDEPENDENT POWER PLANT (UAE) |
SAMSUNG C&T / FUJAIRAH POWER COMPANY F3 |
DAF + SF + SWRO + BWRO | (On-going) |
PULAU INDAH COMBINED CYCLE (Malaysia) |
POSCO E&C / PULAU INDAH POWER PLANT SDN BHD |
DAF + GF + UF + SWRO + BWRO | (On-going) |
JG SUMMIT PETROCHEMICAL PLANT-STAGE 1 EXPANSION (PHLIPPINE) |
FLUOR/ JG SUMMIT PETRO CHEMICAL COPERATION. |
MMF + FSF + SWRO + BWRO | 2018 |
PANAMA COLON POWER PLANT (PANAMA) |
POSCO E&C / MASINLOC POWER PLANT PARTNERS |
DAF + UF + SWRO + BWRO | 2017 |
MASINLOC POWER PLANT-EXPANSION (Philippines) |
POSCO E&C / MASINLOC POWER PLANT PARTNERS |
MMF + UF + SWRO + BWRO | 2017 |
VINH TAN 4, COAL FIRED POWER PLANT (VIETNAM) |
DOOSAN HEAVY INDUSTRIES CO., LTD / VIETNAM ELECTRICITY |
CLARIFIER + ACF + UF + SWRO + BWRO | 2015 |
JAZAN REFINERY AND TERMINAL PLANT (SAUDI ARABIA) |
DAEWOO E&C / SAUDI ARAMCO |
AUTO STRAINER + UF + SWRO | 2014 |
SUR INDEPENDENT POWER PLANT (OMAN) |
DAEWOO E&C MOTT MACDONALD |
MMF + FSF + SWRO + BWRO | 2012 |
JG SUMMIT NCC PLANT (PHILIPPINE) |
DAELIM IND. /JG SUMMIT PETRO CHEMICAL COPERATION. |
MMF + FSF + SWRO + BWRO | 2012 |
PROJECT(LOCATION) | CLIENT | WORK SCOPE | COMPLETION |
---|
POLIMERY POLICE PLANT (POLAND) |
HYUNDAI ENG. PDH Polska S.A. |
MMF + ACF + MBP | (On-going) |
FUJAIRAH F3 INDEPENDENT POWER PLANT (UAE) |
SAMSUNG C&T / FUJAIRAH POWER COMPANY F3 |
DESALINATION + BWRO + MBP | (On-going) |
"OPTIMUM SHAH GAS PLANT-EXPANSION (UAE) |
ADNOC / WOOD | MF + 3B2T | (On-going) |
PULAU INDAH COMBINED CYCLE POWER PLANT (Malaysia) |
POSCO E&C / PULAU INDAH POWER PLANT SDN BHD |
DESALINATION + BWRO + MBP + UV + POLISHER + UF | (On-going) |
S-OIL PLANT-EXPANSION (S.Korea) |
S-OIL(ARAMCO) | ACF + 3B3T + MBP | 2019 |
JG SUMMIT PETROCHEMICAL PLANT-STAGE 1 EXPANSION (PHLIPPINE) |
FLUOR/ JG SUMMIT PETRO CHEMICAL COPERATION. |
- DESALINATION + MBP - AC + CPP(MIXED BED) |
2018 |
S-OIL RUC AREA-5 PLANT (S.Korea) |
DAELIM IND S-OIL(ARAMCO) |
MMF + ACF + 3B3T + MBP | 2018 |
PANAMA COLON POWER PLANT (PANAMA) |
POSCO E&C / MASINLOC POWER PLANT PARTNERS |
- DESALINATION + BWRO + EDI - CHLORINATION |
2017 |
MASINLOC POWER PLANT-EXPANSION (PHLIPPINE) |
POSCO E&C / MASINLOC POWER PLANT PARTNERS |
- DESALINATION + BWRO + MBP - CHLORINATION |
2017 |
KNPC CFP MAB2 PLANT (KUWAIT) |
DAEWOO E&C / KNPC |
- MMF + 2B2T - CPP(MIXED BED) |
2016 |
DAEWOO POCHEON COMBINED CYCLE POWER PLANT (S.Korea) |
DAEWOO E&C / DAEWOO ENERGY |
UF + RO + MBP | 2016 |
SHUQAIQ STEAM POWER PLANT STAGE-Ⅰ (SAUDI ARABIA) |
HYUNDAI HEAVY IND. SAUDI ELECTRICITY COMPANY(SEC) |
FILTERATION + BWRO + CEDI + GTMDO | 2015 |
VINH TAN 4, COAL FIRED POWER PLANT (VIETNAM) |
DOOSAN HEAVY IND. VIETNAM ELECTRICITY |
DESALINATION + BWRO + DG + MBP | 2015 |
MIRFA INDEPENDENT WATER AND POWER PLANT (UAE) |
HYUNDAI E&C MIRFA INTERNATIONAL POWER & WATER COMPANY |
MBE - MBP | 2015 |
SAEMANGUEM POWER PLANT (S.Korea) |
DOOSAN HEAVY IND. OCI SE |
MMF + ACF + 3B3T + MBP | 2015 |
TRIPOLI POWER PLANT (LIBYA) |
HYUNDAI E&C GENERAL ELECTRICITY COMPANY OF LIBYA(GECOL) |
2B2T + MBP(START-UP 4TRAIN OPERATON) | 2014 |
JEDDAH SOUTH THERMAL POWER PLANT STAGE-Ⅰ (SAUDI ARABIA) |
HYUNDAI HEAVY IND. SAUDI ELECTRICITY COMPANY(SEC) |
FILTERATION + BWRO + CEDI + GTMDO | 2014 |
AZITO PHASE III : COMBINED CYCLE POWER PLANT-EXTENSION (Côte d'Ivoire) |
HYUNDAI E&C AZITO ENERGIE |
2B3T+MBP | 2014 |
AZ ZOUR NORTH IWPP (KUWAIT) |
HYUNDAI HEAVY IND. PARTNERSHIPS TECHNICAL BUREAU OF STATE OF KUWAIT |
MBE | 2014 |
MONG DUONG-1 THERMAL POWER PLANT (VIETNAM) |
HYUNDAI E&C VIETNAM ELECTRICITY |
CLARIFIER + GF + ACF + 2B3T + MBP | 2013 |
AL-MUSSAIB REHABILITATION PLANT (IRAQ) |
HYUNDAI E&C MINISTRY OF ELECTRICITY(MOE) REPUBLIC OF IRAQ |
CLARIFIER + MMF + UF + BWRO + DG + BWRO + EDI | 2013 |
GUACOLDA POWER PLANT UNIT-5 | MITSUBISHI HEAVY INDUSTRIES, LTD. | 2B2T + MBP | 2013 |
1131.1MW COMBINED CYCLE POWER PLANT AT RAS DJINET (ALGERIA) |
DAEWOO E&C / SOCIETE ALGERIENNE DE PRODUCTION DE l'ELECTRICITE |
MBE | 2013 |
SUR INDEPENDENT POWER PLANT (OMAN) |
DAEWOO E&C MOTT MACDONALD |
DESALINATION + BWRO + MBP | 2012 |
JG SUMMIT NCC PLANT (PHLIPPINE) |
DAELIM IND. JG SUMMIT PETRO CHEMICAL COPERATION. |
- DESALINATION + BWRO + DG + MBP - AC + CPP(MIXED BED) |
2012 |
NEW HARIPUR POWER PLANT (BANGLADESH) |
HYUNDAI E&C ELECTRICITY GENERATION COMPANY OF BANGLADESH |
CLARIFIER + MMF + BWRO + DG + EDI | 2012 |
KALLPA COMBINED ENERATION PLANT (PERU) |
POSCO E&C KALLPA GENERATION S.A |
MMF + BWRO(2 PASS) + DG + EDI | 2011 |
YANGPYEONG-GUN FILTRATION PLANT (S.Korea) |
YANGPYEONG-GUN | UF(POTABLE WATER) | 2011 |
YEOSU TOTAL ENERGY SUPPLY PLANT (S.Korea) |
HYUNDAI E&C HYUNDAI ENERGY |
- CLARIFIER + GF + 2B3T + MBP - CPP(MIXED BED) |
2011 |
AL-KHALIJ 4X350MW POWER PLANT (LIBYA) |
HYUNDAI E&C GENERAL ELECTRICITY COMPANY OF LIBYA(GECOL) |
2B2T + MBP(START-UP 4TRAIN OPERATON) | 2010 |
AL-SARIR GAS TURBINE POWER PLANT (LIBYA) |
HYUNDAI E&C GENERAL ELECTRICITY COMPANY OF LIBYA(GECOL) |
ACF + BWRO + DG + MBP | 2009 |
SHUAIBA NORTH CO-GENERATION PLANT (KUWAIT) |
HYUNDAI E&C MINISTRY OF ELECTRICITY & WATER |
2B2T + MBP | 2008 |
SONGDO TOTAL ENERGY SUPPLY PLANT (S.Korea) |
DOOSAN HEAVY INDUSTRIES / KOREA DISTRICT HEATING CORPERATION |
- UF + DG + BWRO + EDI - D/H POLISHER(MIXED BED) |
2008 |
PROJECT(LOCATION) | CLIENT | WORK SCOPE | COMPLETION |
---|
LONG PHU 1 THERMAL POWER PLANT (VIETNAM) |
OJSC "POWER MACHINES" (PM) / LONG PHU 1 THERMAL POWER PLANT PROJECT |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + REC/COAGULATION + CLARIFIER + MMF) |
(On-going) |
FUJAIRAH F3 INDEPENDENT POWER PLANT (UAE) |
SAMSUNG C&T / FUJAIRAH POWER COMPANY F3 |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + NEUTRALIZATION) - SEWAGE TREATMENT(BIO TREATMENT) |
(On-going) |
SAMCHEOK THERMAL POWER PLANT (S.Korea) |
DOOSAN HEAVY IND. SC BLUEPOWER |
- PHYSICAL & CHMICAL TREATMENT (API + IAF + REC/COAGULATION + CLARIFIER + MMF) |
(On-going) |
PULAU INDAH COMBINED CYCLE POWER PLANT (Malaysia) |
POSCO E&C / PULAU INDAH POWER PLANT SDN BHD |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + REC/COAGULATION + CLARIFIER + MMF + ACF) - SEWAGE TREATMENT(BIO TREATMENT) |
(On-going) |
DUQM REFINERY - EPC PACKAGE TWO - UTILITIES AND OFFSITES (OMAN) |
PETROFAC-SAMSUNG JV / DUQM REFINERY & PETROCHEMICAL INDUSTRIES LLC |
- PHYSICAL TREATMENT(CLARIFIER) | 2019 |
PANAMA COLON POWER PLANT (PANAMA) |
POSCO E&C / MASINLOC POWER PLANT PARTNERS |
- PHYSICAL & CHMICAL TREATMENT (API + IAF + REC/COAGULATION + CLARIFIER + MMF) - SEWAGE TREATMENT(BIO-TREATMENT) |
2018 |
S-OIL RUC AREA-4 PLANT (S.Korea) |
DAEWOO E&C / S-OIL |
- PHYSICAL & CHMICAL TREATMENT(CPI + DAF) + BIO TREATMENT(A2O) |
2018 |
SARULLA GEOTHERMAL POWER PLANT (NIL) (INDONESIA) |
HYUNDAI E&C SARULLA GEOTHERMAL POWER PLANT |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + NEUTRALIZATION) |
2017 |
BRAKA #3,4 NUCLEAR POWER PLANT (UAE) |
KOREA ELECTRIC POWER CORPORATION / EMIRATES NUCLEAR ENERGY CORPORATION |
- PHYSICAL & CHMICAL TREATMENT + MMF + ACF - REUSE SYSTEM(MMF + EDR) |
2016 |
SHUQAIQ, 600MW STEAM POWER PLANT STAGE-Ⅰ (SAUDI ARABIA) |
HYUNDAI HEAVY IND. SAUDI ELECTRICITY COMPANY |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + NEUTRALIZATION) - SEWAGE TREATMENT(MBR) |
2015 |
MIRFA INDEPENDENT WATER AND POWER PLANT (UAE) |
HYUNDAI ENG. MIRFA INTERNATIONAL POWER & WATER COMPANY |
- PHYSICAL & CHMICAL TREATMENT + MMF + ACF | 2015 |
SARULLA GEOTHERMAL POWER PROJECT (SIL) (INDONESIA) |
HYUNDAI E&C SARULLA GEOTHERMAL POWER PLANT |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + NEUTRALIZATION) |
2015 |
CONSTRUCTION OF CPF COMPLEX AND DEVELOPMENT OF KANDYM GROUP OF FIELDS (UZBEKISTAN) |
HYUNDAI ENG. MKAN |
- PHYSICAL & CHMICAL TREATMENT(CPI + DAF) + BIO TREATMENT(MBR) |
2015 |
SAEMANGUEM POWER PLANT (S.Korea) |
DOOSAN HEAVY IND. OCI SE |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + NEUTRALIZATION) - REUSE SYSTEM(UF + RO) |
2015 |
DAEWOO POCHEON COMBINED CYCLE POWER PLANT (S.Korea) |
DAEWOO E&C / DAEWOO ENERGY |
- PHYSICAL & CHMICAL TREATMENT (API + IAF + REC/COAGULATION + CLARIFIER + MMF) - REUSE SYSTEM(UF + RO) - SEWAGE TREATMENT(BIO-TREATMENT) |
2015 |
UGCC UTILITY & OFFSITES PLANT (UZBEKISTAN) |
HYUNDAI ENG. UGCC |
- PHYSICAL & CHMICAL TREATMENT(CPI + DAF) + BIO TREATMENT(A2O) |
2014 |
TRIPOLI 4X350MW POWER PLANT (LIBYA) |
HYUNDAI E&C GENERAL ELECTRICITY COMPANY OF LIBYA |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + DAF + REC/COAGULATION + CLARIFIER) - SEWAGE TREATMENT(BIO-TREATMENT) |
2014 |
1131.1MW COMBINED CYCLE POWER PLANT AT RAS DJINET (ALGERIE) |
DAEWOO E&C / SOCIETE ALGERIENNE DE PRODUCTION DE l'ELECTRICITE |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + DAF + REC/COAGULATION + CLARIFIER + MMF) - SEWAGE TREATMENT(BIO-TREATMENT) |
2014 |
JEDDAH SOUTH THERMAL POWER PLANT STAGE-Ⅰ (SAUDI ARABIA) |
HYUNDAI HEAVY IND. SAUDI ELECTRICITY COMPANY |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + NEUTRALIZATION) - SEWAGE TREATMENT(MBR) |
2014 |
BRAKA #1,2 NUCLEAR POWER PLANT (UAE) |
KOREA ELECTRIC POWER CORPORATION / EMIRATES NUCLEAR ENERGY CORPORATION |
- PHYSICAL & CHMICAL TREATMENT + MMF + ACF - REUSE SYSTEM(MMF + EDR) |
2014 |
AZ ZOUR NORTH IWPP (KUWAIT) |
HYUNDAI HEAVY IND. PARTNERSHIPS TECHNICAL BUREAU OF STATE OF KUWAIT |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + NEUTRALIZATION) |
2014 |
SHIN-ULCHIN #1,2 NUCLEAR POWER PLANT (S.Korea) |
KOREA HYDRO-NUCLEAR POWER CO., LTD |
- PHYSICAL & CHMICAL TREATMENT + MMF + ACF - REUSE & T-N TREATMENT(MMF + EDR + ECDS) |
2014 |
SEOUL COMBINEX CYCLE POWER PLANT (S.Korea) |
KOREA MIDLAND POWER CO., LTD | - PHYSICAL & CHMICAL TREATMENT (API + IAF + REC/COAGULATION + CLARIFIER + MMF) |
2014 |
MONG DUONG-1 THERMAL POWER PLANT (VIETNAM) |
HYUNDAI E&C VIETNAM ELECTRICITY |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + DAF + REC/COAGULATION + CLARIFIER) |
2013 |
AL-MUSSAIB REHABILITATION PLANT (IRAQ) |
HYUNDAI E&C MINISTRY OF ELECTRICITY(MOE) REPUBLIC OF IRAQ |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + DAF + REC/COAGULATION + CLARIFIER) |
2013 |
QURAYYAH INDEPENDENT POWR PLANT (SAUDI ARABIA) |
SAMSUNG C&T HAJR ELECTRICITY PRODUCTION COMPANY |
- PHYSICAL & CHMICAL TREATMENT - SEWAGE TREATMENT(BIO-TREATMENT) |
2013 |
AZITO PHASE III : COMBINED CYCLE POWER PLANT-EXTENSION (Côte d'Ivoire) |
HYUNDAI E&C AZITO ENERGIE |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + NEUTRALIZATION) |
2013 |
BOROUGE-3, UTILITY & OFFSITES PLANT (UAE) |
HYUNDAI E&C BOROUGE |
- PHYSICAL & CHMICAL TREATMENT (CPI + DAF + MMF) - SEWAGE TREATMENT(BIO TREATMENT-A2O) |
2012 |
SHUWEIHAT S3 INDEPENDENT POWER PLANT (UAE) |
DAEWOO E&C ABU DHABI WATER & ELECTRICITY AUTHORITY |
- PHYSICAL & CHMICAL TREATMENT + MMF + ACF - REUSE & T-N TREATMENT(MMF + EDR + ECDS) |
2012 |
NEW HARIPUR POWER PLANT (BANGLADESH) |
HYUNDAI E&C ELECTRICITY GENERATION COMPANY OF BANGLADESH LTD. |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + DAF + REC/COAGULATION + CLARIFIER) - SEWAGE TREATMENT(BIO-TREATMENT) |
2012 |
SUR INDEPENDENT POWER PLANT (OMAN) |
DAEWOO E&C MOTT MACDONALD |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + DAF + REC/COAGULATION + CLARIFIER) - SEWAGE TREATMENT(BIO-TREATMENT) |
2012 |
ULCHIN #2 NUCLEAR POWER PLANT (S.Korea) |
KOREA HYDRO-NUCLEAR POWER CO., LTD |
- SEWAGE TREATMENT(BIO TREATMENT-2A2O) | 2012 |
WOLSONG NUCLEAR POWER PLANT (S.Korea) |
KOREA HYDRO-NUCLEAR POWER CO., LTD |
- SEWAGE TREATMENT(BIO TREATMENT-2A2O) | 2012 |
YOUNGKWANG NUCLEAR POWER PLANT (S.Korea) |
KOREA HYDRO-NUCLEAR POWER CO., LTD |
- SEWAGE TREATMENT(BIO TREATMENT-2A2O) | 2011 |
IGD-HABSHAN 5, UTILITY & OFFSITES PROJECT (UAE) |
HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD/ GASCO |
- PHYSICAL & CHMICAL TREATMENT (TPI + DAF + MMF) - SEWAGE TREATMENT(BIO TREATMENT-A2O) |
2011 |
2'nd TAEAN #1~8 THERMAL POWER PLANT (S.Korea) |
KOREA WESTERN POWER CO., LTD |
- PHYSICAL & CHMICAL TREATMENT + MMF + ACF | 2011 |
SHIN-KORI #3,4 NUCLEAR POWER PLANT (S.Korea) |
KOREA HYDRO-NUCLEAR POWER CO., LTD |
- PHYSICAL & CHMICAL TREATMENT + MMF + ACF - REUSE & T-N TREATMENT(MMF + EDR + ECDS) |
2011 |
AL-KHALIJ 4X350MW POWER PLANT (LIBYA) |
HYUNDAI E&C GENERAL ELECTRICITY COMPANY OF LIBYA |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + DAF + REC/COAGULATION + CLARIFIER) - SEWAGE TREATMENT(BIO-TREATMENT) |
2010 |
SHIN-WOLSONG #1,2 NUCLEAR POWER PLANT (S.Korea) |
KOREA HYDRO-NUCLEAR POWER CO., LTD |
- PHYSICAL & CHMICAL TREATMENT + MMF + ACF - REUSE & T-N TREATMENT(MMF + EDR + ECDS) |
2010 |
KORI NUCLEAR POWER PLANT (S.Korea) |
KOREA HYDRO-NUCLEAR POWER CO., LTD |
- SEWAGE TREATMENT(BIO TREATMENT-2A2O) | 2010 |
AL-DUR IWPP (BAHRAIN) |
HYUNDAI HEAVY IND. SUEZ AND GULF INVESTMENT INC. |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + NEUTRALIZATION) - SEWAGE TREATMENT(MBR) |
2009 |
AL-JALAMID POWER PLANT & MAIN SUBSTATION (SAUDI ARABIA) |
MIDDLE EAST E&D MA'ADEN PHOSPHATE COMPANY |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + OIL REMOVAL FILTER + NEUTRALIZATION) |
2009 |
AL-SARIR GAS TURBINE POWER PLANT (LIBYA) |
HYUNDAI E&C GENERAL ELECTRICITY COMPANY OF LIBYA |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + REC/COAGULATION + CLARIFIER) - SEWAGE TREATMENT(BIO-TREATMENT) |
2009 |
SHIN-KORI #1,2 NUCLEAR POWER PLANT (S.Korea) |
KOREA HYDRO-NUCLEAR POWER CO., LTD |
- PHYSICAL & CHMICAL TREATMENT + MMF + ACF - REUSE & T-N TREATMENT(MMF + EDR + ECDS) |
2009 |
SHUAIBA NORTH CO-GENERATION PLANT (KUWAIT) |
HYUNDAI E&C MINISTRY OF ELECTRICITY & WATER |
- PHYSICAL & CHMICAL TREATMENT (API + CPI + NEUTRALIZATION) |
2008 |
1'st TAEAN #1~8 THERMAL POWER PLANT (S.Korea) |
KOREA WESTERN POWER CO., LTD |
- PHYSICAL & CHMICAL TREATMENT + MMF + ACF | 2008 |
ULCHIN NUCLEAR POWER PLANT (S.Korea) |
KOREA HYDRO-NUCLEAR POWER CO., LTD |
- SEWAGE TREATMENT(BIO TREATMENT-2A2O) | 2008 |